The bare frame commuter
A 1990s frame out of a loft, built into something that does seven miles a day in the wet and needs almost nothing doing to it.
One chainring, dynamo lighting, hand built front wheel.
- Cost
- £740 to £870
- Time
- Three weeks
Builds
We take on a handful of custom builds a year. These are six of them, with the brief we were given, the parts we chose and why, what it honestly cost, and how long it actually took including the weeks we spent waiting.
The costs are ranges because parts prices move. Nothing here is rounded down to look better.
A 1990s frame out of a loft, built into something that does seven miles a day in the wet and needs almost nothing doing to it.
One chainring, dynamo lighting, hand built front wheel.
Six weeks and 2,000 miles carrying everything, built around one rule: every part had to be fixable at the side of a road.
Friction shifting, rim brakes, 36 spoke wheels, spare spokes taped to the frame.
Two children, a hill, no car. The heaviest thing we have built and the only one where we argued for a week before ordering.
Hydraulic disc front, drum rear, hub gears, high tension small wheels.
Three hundred and fifty pounds, all in. The owner's damaged wheels trued and reused, and one thing we refused to leave off.
Reused wheels, second hand frame, two brakes, new wearing parts.
The build where our main job was talking the owner out of the expensive thing and moving the money somewhere they would feel it.
Stock wheels not custom, 42mm tubeless tyres, mechanical discs.
The owner's father's bike out of a garage after twenty years. We did about half of what they asked for, and it cost half what they expected.
Original paint kept, five speed friction shifting kept, everything perished replaced.
What these have in common
Read enough of these and a pattern shows up, because we work the same way every time.
The touring bike and the gravel bike are both drop bar bikes with wide tyres, and almost nothing else about them is the same. One was built for a rider who needed to fix it in a lay by. The other for a rider doing thirty miles on a Sunday. Same category, completely different bikes.
We talked the gravel rider out of hand built wheels and the road bike owner out of a respray. Both saved money and both ended up with a better bike for what they actually do. If we think you are about to spend money in the wrong place, we will say so before we take it.
Every build here came in at or under the number we were given at the start, and that is only possible because we knew the number. The single speed was £350 and it worked because we designed to £350 from the first conversation.
Wheels, frames, seatposts, bars. On the student build reusing a damaged wheelset saved more than every other decision combined. Bring us the box of old parts, even the ones you think are scrap.
Look at the timings and the bench time is rarely more than a week. The rest is frames, racks and freewheels in transit. We tell you which weeks are work and which are waiting, so you know whether a delay is ours.
Where to go next